1、Clean the base to ensure the base are firm and smooth , avoid sand, cracks and uneven .
2、Brush the base primer on the base after well treatment .The configuration of the base primer is well mixed polymer emulsion and water with the rate of 1:19. The construction of waterproof coating shall be carried out after the primer is completely dried.
3、A bag of polymer emulsion should be mixed with a bag of inorganic mixed material. Firstly ,pouring the polymer emulsion into the barrel and then adding the mixture slowly at the same time; stirring it until no agglomeration, then it can be used.(stirring in batches according to the size of construction area, the ready mixed coating shall be used within one hour.)
4、If the base is dry ,you can wet the base first , but no water obviously .The toilet tube root, the mouth of drain pipe and the inside corner should be painted first .
5、After the detail parts painted ,the large area of waterproof construction can be carried out . The waterproof coating is recommended to be painted 2-3 times .Depending on the importance of the site base and location, mesh cloth can be installed for strengthening layer treatment (lay it after the first waterproof coating painted ). After each coating film is completely dried, the next coating film construction can be carried out.
6、The closed water test is required after the final coating is completely dry .
7、The waterproofing layer coating painted thickness should be 1.5-2.0mm ; The crossing method should be used every painting .The thickness of the painting should be uniform as far as possible .
Precautions
● Construction temperature should be between 5℃ to 35 ℃
● The good mixed slurry should be used within 1 hour .Water can’t be added during use .
● Sealing and storage of the polymer emulsion or the inorganic mixed material which has not been used after opening .
● The waterproofing coating film should be protected from damage during construction .
● If drink it by mistake ,seek medical advice immediately
● If the liquid enters into the eyes ,it should be washed in a large amount of water immediately , and the doctor should be examined as soon as possible .
Ratio and coverage
polymer emulsion: inorganic mixed material =1:1(bag); 1.0mm thickness of coating film needs about 1.8-2.2kg/㎡slurry.
Storage
The storage should be done with sun protection ,anti-freeze , moisture -proof, and placed in the stipulated safe storage room. The storage temperature should not be lower than 5 ℃. The service life of the product is not less than 12 months .
Schematic drawing
Clean the base and moisten the wall with brush
Ingredients and Stirring
Details Enhanced Processing
First Painting
econd Painting
Close Water Testing